Client
University of Mary Washington
Location
Fredericksburg, VA
Project Description
As a part of an overall stormwater management plan to address current and future stormwater quality and quantity management needs, Koontz Bryant Johnson Williams in collaboration with ES, LLC a subconsultant, assessed existing stream outfalls and formulated a plan to address the extensive erosion of the channels. Stream restoration and stabilization plans were prepared for several drainage outfalls on the main campus.
Solutions Offered
• Steep terrain
• Limited construction access
• Budget constraints
• Minimizing land disturbance
• Protect existing infrastructure
• Preserve native vegetation
• Obtaining jurisdictional permits
• Obtaining federal agency approvals
• Post construction vegetation establishment and proper functioning
Budget
TBD
Completion Date
TBD